AL SB289

Bill

Status

Introduced

3/5/2013

Primary Sponsor

Slade Blackwell

Click for details

Origin

Senate

Regular Session 2013

AI Summary

SB289 Summary

  • Authorizes public owners to use two alternative project delivery methods for public works contracts: construction manager at risk and design-build, in addition to the existing design-bid-build method.

  • Construction manager at risk can self-perform up to 10 percent of project work and must select all subcontractors through a competitive proposal process; assumes risk at a guaranteed maximum price.

  • Design-builder must provide both design (by licensed design professionals) and construction services for a lump sum or guaranteed maximum cost, selected through prequalification and competitive proposals.

  • Excludes all contracts by the Alabama Department of Transportation from using the construction manager at risk or design-build methods.

  • Establishes Class C felony penalties for willful violations and requires all contracting documents to be public and available for inspection upon citizen request; effective January 1, 2014.

Legislative Description

Public Works Contracts, construction manager at risk and design-builder selection authorized, Department of Transportation excluded Articles 2 and 3, Secs. 39-2-1, 39-2-2 am'd.; Secs. 39-2-30 to 39-2-33, inclusive, 39-2-40 to 39-2-43, inclusive, added

Public Works Contracts

Last Action

Read for the first time and referred to the Senate committee on Commerce, Transportation, and Utilities

3/5/2013

Committee Referrals

Commerce, Transportation, and Utilities3/5/2013

Full Bill Text

No bill text available