Loading chat...

AL SB403

Bill

Status

Passed

3/19/2014

Primary Sponsor

Phillip Williams

Click for details

Origin

Senate

Regular Session 2014

AI Summary

SB403 Summary

  • Applies only to Etowah County and requires a permit from local governing bodies (county commission or city/town councils) before constructing, installing, or operating any wind energy conversion system.

  • Local governments must adopt regulations addressing permit applications, public notification procedures, turbine types, site layout, operation and maintenance standards, permit fees of $1,000 per system plus all review costs, and permit revocation provisions.

  • Applicants must maintain financial assurance equal to reclamation plan costs plus $1,000,000 liability coverage for damages to adjoining properties, with assurance remaining in effect for the system's lifetime.

  • Wind energy systems must comply with multiple safety and design requirements including: certified design by licensed engineers, manual and automatic overspeed controls, noise limits not exceeding 40 decibels at property lines, 2,500-foot minimum encroachment distance from adjacent properties, and anti-climbing devices on towers.

  • Systems deemed abandoned after 365 consecutive days without operation must be removed by the operator, though permit holders may request delays with proof the system will become operable.

Legislative Description

Etowah Co., wind energy conversion systems, permitting and regulation of by municipal governing body or county commission, certification by licensed engineer required, regulation of location, design, and operation of systems

Etowah County

Last Action

Assigned Act No. 2014-191.

3/19/2014

Committee Referrals

Local Legislation2/27/2014
Local Legislation No. 12/25/2014

Full Bill Text

No bill text available