AL HB629
Bill
Status
6/4/2015
Primary Sponsor
Nathaniel Ledbetter
Click for details
AI Summary
HB629 Summary
-
Requires permit from local governing body in DeKalb County before constructing, installing, or operating wind energy conversion systems, with property appropriately zoned.
-
Applicant must submit application including property owner information, plot plan showing system location and distances from property lines, visual simulation, and reclamation plan.
-
Wind energy conversion system tower design must be certified by licensed engineer with prior wind turbine experience, comply with building and electrical codes, and be equipped with manual and automatic overspeed controls.
-
Applicant must maintain $1,000,000 financial assurance for liability damages and additional assurance covering reclamation and removal costs; system cannot exceed 40 decibels at property line and must maintain 2,500-foot setback from adjacent properties.
-
Systems unused for 365 consecutive days may be deemed abandoned and must be removed; act becomes effective three months after passage.
Legislative Description
DeKalb Co., wind energy conversion systems, permitting and regulation of by municipal governing body or county commission, certification by licensed engineer required, regulation of location, design, and operation of systems
DeKalb County
Last Action
Delivered to Governor at 9:30 a.m. on June 4, 2015.
6/4/2015