Loading chat...

AZ HB2880

Bill

Status

Engrossed

2/28/2020

Primary Sponsor

Bret Roberts

Click for details

Origin

House of Representatives

Fifty-fourth Legislature - Second Regular Session (2020)

AI Summary

HB2880 Summary

  • Allows the director to approve assignment of assured water supply certificates without re-evaluating groundwater physical availability if the assignment does not increase total groundwater demand compared to the original designation in the Pinal active management area.

  • Deems water physically available for assured water supply purposes when it consists of stored water recovered through existing long-term storage credits or water to be stored and recovered in the future, if it meets physical availability requirements.

  • Defines "area of impact" for groundwater recovery purposes as within one mile of an underground storage facility, within an irrigation district boundary with a groundwater savings facility permit, or other areas demonstrated to be positively impacted by storage activity through an approved hydrologic model.

  • Requires that lot number changes to plats in the Pinal active management area shall not be considered material changes when evaluating assured water supply certificate modifications or renewals.

Legislative Description

Assured water supply; availability; plats

Waters - Title 45

Last Action

Senate WAG Committee action: Do Pass, voting: (4-2-1-0)

3/12/2020

Full Bill Text

No bill text available