Loading chat...

AZ HB2741

Bill

Status

Introduced

2/2/2021

Primary Sponsor

Andrea Dalessandro

Click for details

Origin

House of Representatives

Fifty-fifth Legislature - First Regular Session (2021)

AI Summary

  • Establishes a moratorium on construction of new wells in the upper San Pedro groundwater basin and Verde Valley groundwater subbasin, effective on the bill's enactment date.

  • Prohibits the Arizona Department of Water Resources from issuing permits or drilling cards for new wells in these basins, with limited exceptions.

  • Allows replacement wells to be drilled under rules established by the department director.

  • Exempts wells that the director determines will not pump the subflow of a river system or other water source.

  • Exempts wells constructed after the conclusion of the general adjudication of water rights in the Gila River.

Legislative Description

Well drilling; groundwater basins..

Waters - Title 45

Last Action

House read second time

2/3/2021

Committee Referrals

Rules2/3/2021
Natural Resources, Energy & Water2/2/2021

Full Bill Text

No bill text available