Loading chat...

AZ HB2463

Bill

Status

Introduced

1/24/2022

Primary Sponsor

Andres Cano

Click for details

Origin

House of Representatives

Fifty-fifth Legislature - Second Regular Session (2022)

AI Summary

  • Establishes a moratorium on constructing new wells in the upper San Pedro groundwater basin and Verde Valley groundwater subbasin, effective upon passage of this section.

  • Prohibits the Department of Water Resources from issuing permits or drilling cards for new wells in these basins, except for replacement wells as defined by director rules.

  • Exempts wells that the director determines will not pump the subflow of a river system or other water source from the moratorium.

  • Exempts wells constructed after completion of the general adjudication of water rights in the Gila River from the moratorium.

Legislative Description

Well drilling; groundwater basins.

Waters - Title 45

Last Action

House read second time

1/25/2022

Committee Referrals

Rules1/24/2022
Land, Agriculture and Rural Affairs1/24/2022
Natural Resources, Energy & Water1/24/2022

Full Bill Text

No bill text available