Loading chat...
AZ SB1023
Bill
Status
Introduced
1/10/2022
Primary Sponsor
Victoria Steele
Click for details
AI Summary
-
Establishes a moratorium on new well construction and permits in the Upper San Pedro groundwater basin and Verde Valley groundwater subbasin, effective upon the bill's enactment.
-
Exempts replacement wells as prescribed in rules adopted by the director from the moratorium.
-
Exempts wells that the director determines will not pump the subflow of a river system or source from the moratorium.
-
Exempts wells constructed after the conclusion of the general adjudication of water rights in the Gila River from the moratorium.
Legislative Description
Well drilling; groundwater basins
Waters - Title 45
Last Action
Senate read second time
1/11/2022
Committee Referrals
Rules1/10/2022
Natural Resources, Energy and Water1/10/2022
Full Bill Text
No bill text available