Loading chat...

AZ SB1023

Bill

Status

Introduced

1/10/2022

Primary Sponsor

Victoria Steele

Click for details

Origin

Senate

Fifty-fifth Legislature - Second Regular Session (2022)

AI Summary

  • Establishes a moratorium on new well construction and permits in the Upper San Pedro groundwater basin and Verde Valley groundwater subbasin, effective upon the bill's enactment.

  • Exempts replacement wells as prescribed in rules adopted by the director from the moratorium.

  • Exempts wells that the director determines will not pump the subflow of a river system or source from the moratorium.

  • Exempts wells constructed after the conclusion of the general adjudication of water rights in the Gila River from the moratorium.

Legislative Description

Well drilling; groundwater basins

Waters - Title 45

Last Action

Senate read second time

1/11/2022

Committee Referrals

Rules1/10/2022
Natural Resources, Energy and Water1/10/2022

Full Bill Text

No bill text available