Loading chat...

AZ HB2278

Bill

Status

Introduced

1/18/2023

Primary Sponsor

Andres Cano

Click for details

Origin

House of Representatives

Fifty-sixth Legislature - First Regular Session (2023)

AI Summary

  • Establishes a moratorium on construction of new wells in the upper San Pedro groundwater basin and Verde Valley groundwater subbasin, effective upon enactment.

  • Prohibits the Department from issuing permits or drilling cards for new wells in these basins, except under three specific exemptions.

  • Exempts replacement wells as prescribed in rules adopted by the department director.

  • Exempts wells that the director determines will not pump the subflow of a river system or source.

  • Exempts wells constructed after conclusion of the general adjudication of water rights in the Gila River.

Legislative Description

Well drilling; groundwater basins.

Waters - Title 45

Last Action

House read second time

1/19/2023

Committee Referrals

Rules1/18/2023
Natural Resources, Energy & Water1/18/2023

Full Bill Text

No bill text available