Loading chat...
AZ HB2278
Bill
Status
Introduced
1/18/2023
Primary Sponsor
Andres Cano
Click for details
AI Summary
-
Establishes a moratorium on construction of new wells in the upper San Pedro groundwater basin and Verde Valley groundwater subbasin, effective upon enactment.
-
Prohibits the Department from issuing permits or drilling cards for new wells in these basins, except under three specific exemptions.
-
Exempts replacement wells as prescribed in rules adopted by the department director.
-
Exempts wells that the director determines will not pump the subflow of a river system or source.
-
Exempts wells constructed after conclusion of the general adjudication of water rights in the Gila River.
Legislative Description
Well drilling; groundwater basins.
Waters - Title 45
Last Action
House read second time
1/19/2023
Committee Referrals
Rules1/18/2023
Natural Resources, Energy & Water1/18/2023
Full Bill Text
No bill text available