Loading chat...
AZ SB1447
Bill
Status
Introduced
2/2/2023
Primary Sponsor
Priya Sundareshan
Click for details
AI Summary
-
Establishes a moratorium on construction of new wells in the upper San Pedro groundwater basin and Verde Valley groundwater subbasin, effective upon enactment.
-
Prohibits the Department of Water Resources from issuing permits or drilling cards for new wells in these basins, with limited exceptions.
-
Exempts replacement wells as defined in rules adopted by the director.
-
Exempts wells that the director determines will not pump the subflow of a river system or source.
-
Exempts wells constructed after the conclusion of the general adjudication of water rights in the Gila River.
Legislative Description
Well drilling; groundwater basins
Groundwater
Last Action
Senate read second time
2/9/2023
Committee Referrals
Rules2/2/2023
Natural Resources, Energy and Water2/2/2023
Full Bill Text
No bill text available