Loading chat...
CA AB1552
Bill
Status
Engrossed
5/14/2009
Primary Sponsor
Sam Blakeslee
Click for details
AI Summary
AB 1552 Summary
- Requires best available technology for municipally owned coastal powerplants to be evaluated on a facility-wide basis using design flow
- Defines feasibility for installing best available technology according to Section 21061.1 of the Public Resources Code
- Allows municipally owned coastal powerplants until December 31, 2031 to comply with the State Water Resources Control Board's water quality control policy on coastal and estuarine waters for powerplant cooling
- Permits compliance date suspensions or modifications if system or local reliability would be jeopardized by the 2031 deadline
Legislative Description
Water: coastal powerplants.
Last Action
Withdrawn from committee. Re-referred to Com. on RLS.
8/23/2010
Committee Referrals
Rules8/23/2010
Appropriations7/15/2010
Rules5/14/2009
Appropriations4/29/2009
Utilities and Commerce4/2/2009
Full Bill Text
No bill text available