Loading chat...
CA AB2205
Bill
Status
9/7/2012
Primary Sponsor
Manuel Perez
Click for details
AI Summary
-
Expands the definition of waste from extraction, beneficiation, and processing of ores and minerals to include spent brine solutions used to produce geothermal energy under specified conditions.
-
Requires spent brine solutions transferred via closed piping to adjacent facilities for mineral recovery to comply with federal standards (40 CFR 261.4(a)(17)(i)-(iii)) and be returned through closed piping after processing.
-
Exempts geothermal waste from drilling operations and non-drilling geothermal energy production from hazardous waste requirements if contained within piping systems, trenches, or lined surface impoundments at the generating plant.
-
Establishes that geothermal waste exemptions expire 18 months after a power plant ceases production or a surface impoundment stops receiving waste, unless the operator submits written notification and receives department acknowledgment of intent to resume operations.
-
Excludes solid or semisolid hazardous residuals (including filter cakes) and wastes not directly associated with geothermal energy production from the exemption.
Legislative Description
Hazardous waste: ores and minerals: geothermal waste.
Last Action
Chaptered by Secretary of State - Chapter 253, Statutes of 2012.
9/7/2012