CA AB2856

Bill

Status

Failed

11/30/2016

Primary Sponsor

Autumn Burke

Click for details

Origin

State Assembly

2015-2016 Session

AI Summary

  • Requires the Public Utilities Commission to mandate installation of automatic shutoff or remote-controlled sectionalized block valves on intrastate transmission lines located in high consequence areas or traversing active seismic earthquake faults, if determined necessary for public protection.

  • Requires gas pipeline operators to submit valve location plans and recommendations to the commission, which may modify the plans as deemed necessary for public protection.

  • Directs the commission to establish installation timelines, prioritization standards, and monitoring procedures to ensure automatic or remote shutoff valves are installed as quickly as reasonably possible.

  • Authorizes gas corporations to recover all reasonably incurred costs for implementing the valve installation requirements through rate recovery.

  • Requires the commission to adopt safety standards compatible with federal Pipeline and Hazardous Materials Safety Administration standards for implementing these requirements.

Legislative Description

Intrastate transmission line: safety valves.

Last Action

Died at Desk.

11/30/2016

Full Bill Text

No bill text available