Requires the Public Utilities Commission to mandate installation of automatic shutoff or remote-controlled sectionalized block valves on intrastate transmission lines located in high consequence areas or traversing active seismic earthquake faults, if determined necessary for public protection.
-
Requires gas pipeline operators to submit valve location plans and recommendations to the commission, which may modify the plans as deemed necessary for public protection.
-
Directs the commission to establish installation timelines, prioritization standards, and monitoring procedures to ensure automatic or remote shutoff valves are installed as quickly as reasonably possible.
-
Authorizes gas corporations to recover all reasonably incurred costs for implementing the valve installation requirements through rate recovery.
-
Requires the commission to adopt safety standards compatible with federal Pipeline and Hazardous Materials Safety Administration standards for implementing these requirements.