CA SB1262

Bill

Status

Passed

9/17/2018

Primary Sponsor

Jim Beall

Click for details

Origin

Senate

2017-2018 Session

AI Summary

  • Removes the previous cap of 24 projects on the Department of Transportation's use of the Construction Manager/General Contractor (CM/GC) delivery method for highway, bridge, and tunnel construction

  • Requires at least two-thirds of CM/GC projects to use department employees or contracted consultants for project design and engineering services

  • Maintains requirement that all CM/GC projects use department employees or contracted consultants for construction inspection services

  • Requires an interim report to the Legislature by July 1, 2021, covering CM/GC projects approved as of January 1, 2021, and a final report by July 1, 2025, with data on project costs, completion stages, and time savings

  • Two projects remain reserved for Riverside County, with the Riverside County Transportation Commission authorized to use the CM/GC method for those projects

Legislative Description

Construction Manager/General Contractor project delivery method: Department of Transportation.

Last Action

Chaptered by Secretary of State. Chapter 465, Statutes of 2018.

9/17/2018

Committee Referrals

Appropriations6/26/2018
Transportation5/31/2018
Appropriations4/25/2018
Transportation and Housing3/1/2018
Rules2/15/2018