Requires each electrical corporation to install monitoring equipment on transmission and distribution lines in high fire threat areas by December 31, 2020.
-
Monitoring equipment must be installed between each set of poles or towers and generate raw data on line temperature, ambient temperature, electrical current, line movement, and barometric pressure.
-
Monitoring technology must use satellite communication for connectivity and be noninvasive at point of installation.
-
Installation and maintenance work must be performed by utility workforce or workers paid prevailing wage as determined by the Director of Industrial Relations; non-utility enterprises must submit wage schedules to the commission.
-
No state reimbursement is required because costs incurred by local agencies or school districts result from creation of a new crime within the Public Utilities Act.
Legislative Description
Electrical corporations: high firethreat areas: electrical grid monitoring equipment.
Last Action
From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.