Loading chat...

CA AB1789

Bill

Status

Failed

2/3/2020

Primary Sponsor

Heath Flora

Click for details

Origin

State Assembly

2019-2020 Session

AI Summary

  • Requires each electrical corporation to install monitoring equipment on transmission and distribution lines in high fire threat areas by December 31, 2020.

  • Monitoring equipment must be installed between each set of poles or towers and generate raw data on line temperature, ambient temperature, electrical current, line movement, and barometric pressure.

  • Monitoring technology must use satellite communication for connectivity and be noninvasive at point of installation.

  • Installation and maintenance work must be performed by utility workforce or workers paid prevailing wage as determined by the Director of Industrial Relations; non-utility enterprises must submit wage schedules to the commission.

  • No state reimbursement is required because costs incurred by local agencies or school districts result from creation of a new crime within the Public Utilities Act.

Legislative Description

Electrical corporations: high firethreat areas: electrical grid monitoring equipment.

Last Action

From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.

2/3/2020

Committee Referrals

Rules5/2/2019
Transportation3/18/2019

Full Bill Text

No bill text available