AI Summary
-
Requires the Public Utilities Commission to ensure microgrid commercialization standards do not impose size caps on microgrids that use non-combustion technologies and can operate continuously for 72 hours or longer.
-
Requires local publicly owned electric utilities to ensure their standardized microgrid interconnection processes do not impose size caps on microgrids meeting the same non-combustion and 72-hour continuous operation criteria.
-
Mandates local utilities establish a standardized interconnection process for customer-supported microgrids within 180 days of a customer or developer's request, including separate electrical rates and tariffs.
-
Requires utility microgrid rates to not shift costs between microgrid and non-microgrid customers and ensures microgrid components comply with applicable regulatory requirements.