AI Summary
-
Expands definition of "subsurface installation" to include nonpressurized sewerlines, storm drains, and drain lines previously excluded from the Dig Safe Act of 2016.
-
Requires Department of Transportation to join regional notification centers and share costs beginning January 1, 2025.
-
Revises "legal excavation start date and time" to exclude weekends and holidays, and removes the 7:00 a.m. to 5:00 p.m. hour limitation for working days.
-
Changes damage notification requirements: excavators must call 911 and notify the board within 2 hours for life-threatening damage, or within 2 hours for non-life-threatening damage.
-
Modifies vacuum excavation requirements to mandate equipment be "designed, engineered, and purpose built" for such work, and requires operators to indicate non-agreement with vacuum methods in their response.
Legislative Description
Excavations: subsurface installations.
Last Action
May 19 hearing: Held in committee and under submission.