AI Summary

  • Requires the Public Utilities Commission to update General Order 131-D by January 1, 2026, to exempt advanced reconductoring projects on existing electrical transmission facilities (50 kilovolt or above) from the standard permit-to-construct requirement.

  • Allows electrical corporations to seek commission approval for advanced reconductoring through the informal Tier 2 Advice Letter process instead of formal permitting procedures.

  • Requires the commission to update its Tier 2 Advice Letter process in General Order 96-B by January 1, 2026, to authorize filings for advanced reconductoring projects.

  • Defines "advanced conductor" as overhead electricity conductor with at least 10 percent lower electrical resistance than existing similar-diameter conductors, and "advanced reconductoring" as replacing existing transmission or distribution lines with advanced conductors.

  • Specifies no state reimbursement is required to local agencies or school districts because any costs result from changes to criminal penalties under the Public Utilities Act.

Legislative Description

Electricity: permit to construct: advanced reconductoring: exemption.

Last Action

In committee: Held under submission.

8/15/2024

Committee Referrals

Appropriations6/25/2024
Energy, Utilities and Communications6/5/2024
Rules5/24/2024
Appropriations4/18/2024
Utilities and Energy3/18/2024

Full Bill Text

No bill text available