CA AB427

Bill

Status

Passed

9/8/2023

Primary Sponsor

David Alvarez

Click for details

Origin

State Assembly

2023-2024 Session

AI Summary

  • Adds Construction Manager/General Contractor (CMGC) as an alternative project delivery method for SANDAG's State Highway Route 11 corridor project, in addition to existing design-build and design sequencing options.

  • Removes the requirement that SANDAG use the traditional design-bid-build method if conditions for alternative delivery methods are not met, allowing flexibility in project delivery selection.

  • Requires SANDAG to enter a separate preconstruction services contract with the construction manager before negotiating a fixed price or guaranteed maximum price for construction work.

  • Mandates the construction manager perform at least 30 percent of the construction work directly, with remaining work bid to subcontractors under Public Contract Code Section 6955.

  • Takes effect immediately as an urgency statute to meet critical project deadlines and stakeholder agreements with state, local, and federal partners.

Legislative Description

Otay Mesa East Toll Facility Act: alternative project delivery method.

Last Action

Chaptered by Secretary of State - Chapter 163, Statutes of 2023.

9/8/2023