CA SB1006
Bill
AI Summary
-
Requires each transmission utility to prepare a feasibility study of grid-enhancing technology projects by January 1, 2026, and every 2 years thereafter to increase transmission capacity and connect renewable energy resources.
-
Requires each transmission utility to prepare a study of transmission lines that can be reconductored with advanced conductors by January 1, 2026, and at least every 4 years thereafter to achieve increased capacity and reliability.
-
Mandates transmission utilities submit study results to the Independent System Operator and request inclusion of grid-enhancing technologies and reconductoring in annual transmission planning processes.
-
Requires transmission utilities to make studies publicly available upon submission to the Independent System Operator, except for information determined necessary to protect electrical transmission system security.
-
Directs electrical corporations operating distribution systems to consider grid-enhancing technologies and advanced conductor reconductoring as part of annual distribution planning.
Legislative Description
Electricity: transmission capacity: reconductoring and grid-enhancing technologies.
Last Action
Chaptered by Secretary of State. Chapter 597, Statutes of 2024.
9/25/2024