Loading chat...

CA AB1425

Bill

Status

Failed

2/2/2026

Primary Sponsor

Joaquin Arambula

Click for details

Origin

State Assembly

2025-2026 Regular Session

AI Summary

  • Prohibits pit dewatering in areas where subsurface river flow or groundwater levels are shallower than 50 feet below ground anywhere within the San Joaquin River Parkway

  • Defines "pit dewatering" as water impounded or collected in a pit that is pumped, drained, or otherwise removed by the pit operator, including wet pit overflows caused by direct rainfall or groundwater seepage

  • Applies specifically to the San Joaquin River Parkway as defined in the March 2018 San Joaquin River Parkway Master Plan Update

  • Declares that a special statute is necessary due to the unique needs of communities within and surrounding the San Joaquin River Parkway

Legislative Description

San Joaquin River Parkway: pit dewatering.

Last Action

From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.

2/2/2026

Committee Referrals

Natural Resources3/28/2025

Full Bill Text

No bill text available