Loading chat...

HI HCR140

Concurrent Resolution

Status

Introduced

3/10/2017

Primary Sponsor

Sean Quinlan

Click for details

Origin

House of Representatives

2017 Regular Session

AI Summary

  • Urges the Public Utilities Commission to require that all documents, testimony, and visual displays submitted in connection with a docket include accurate net or projected energy generation information in addition to nameplate capacity.

  • Requires that all applicable discussions during public meetings of the Public Utilities Commission refer to net or projected energy generation in addition to nameplate capacity.

  • Notes that statewide wind production capacity is estimated at 171 megawatts by nameplate but only 32 percent actual energy capacity, and that solar and wind calculations often do not represent actual energy generation.

  • Recognizes that the public can be misled by the distinction between advertised nameplate capacity and actual net energy generation, affecting informed testimony on dockets.

  • Directs transmission of certified copies to the Governor, Director of Business, Economic Development, and Tourism, Chair of the Public Utilities Commission, and Hawaii State Energy Office.

Legislative Description

Urging The Public Utilities Commission To Require That All Documents, Testimony, And Visual Displays Submitted To The Commission, In Connection With A Docket Include Accurate Information On The Net Or Projected Energy Generation In Addition To The Nameplate Capacity.

Public Utilities Commission

Last Action

The committee(s) on EEP recommend(s) that the measure be deferred.

3/21/2017

Committee Referrals

Energy & Environmental Protection3/14/2017

Full Bill Text

No bill text available