HI SB2584

Bill

Status

Introduced

1/21/2022

Primary Sponsor

Stanley Chang

Click for details

Origin

Senate

2022 Regular Session

AI Summary

SB 2584 Summary

  • Direct the Public Utilities Commission to adopt guidelines requiring electric utilities to develop load management plans that integrate distributed energy resources and energy efficiency before interconnecting new residential, commercial, or industrial developments that trigger infrastructure upgrade costs exceeding a commission-determined threshold.

  • Require load management plans to study and integrate customer-sited distributed energy resources (such as rooftop solar) and energy efficiency measures to reduce the need for utility infrastructure expenditures on distribution and transmission systems.

  • Establish commission approval criteria for load management plans, including evaluation of the plan's potential to defer or avoid infrastructure upgrade costs, with defined timelines for utility submission and commission review.

  • Allow electric utilities to recover approved costs for developing and implementing load management plans through a commission-approved cost recovery mechanism.

  • Effective date: July 1, 2050.

Legislative Description

Relating To Energy Interconnection.

Public Utilities Commission

Last Action

The committee on CPN deferred the measure.

2/23/2022

Committee Referrals

Commerce and Consumer Protection2/18/2022
Energy, Economic Development, and Tourism1/24/2022

Full Bill Text

No bill text available