Loading chat...

HI SR51

Resolution

Status

Passed

4/4/2024

Primary Sponsor

Dru Kanuha

Click for details

Origin

Senate

2024 Regular Session

AI Summary

  • Route 11 (Mamalahoa Highway) near Mile Post 60 on Hawaii Island experiences frequent flooding that causes highway closures, creating a safety hazard for residents who depend on this road as their primary access to medical services and emergency evacuation routes.

  • The highway was constructed before 1962 and lacks adequate drainage elements in the low-lying flooded section; the road has closed at least six times since 2012 due to flooding.

  • The Department of Transportation is requested to prioritize remediation of the flooding as a safety project and consider previously studied solutions including flood monitoring systems, raising the highway up to ten feet, and installing culverts.

  • The Department of Transportation must submit a detailed remediation plan including an estimated budget to the Legislature no later than twenty days before the Regular Session of 2025 convenes.

  • Certified copies of this resolution shall be transmitted to the Director of Transportation and the Mayor of Hawaii County.

Legislative Description

Requesting The Department Of Transportation To Prioritize Remediation Of The Flooding Issues Present On Route 11 Around Mile Post Sixty As A Safety Project.

Last Action

Certified copies of resolution sent, 05-31-24

5/31/2024

Committee Referrals

Transportation and Culture and the Arts3/14/2024

Full Bill Text

No bill text available