Loading chat...
IA HF2257
Bill
Status
Introduced
2/3/2026
Primary Sponsor
Ken Croken
Click for details
AI Summary
- Amends Iowa Code Section 476.53A to establish maximum setback standards for wind energy conversion facilities that local authorities cannot exceed
- Requires wind turbines to be sited at least 2 times the total facility height from existing dwellings or community buildings (schools, places of worship, day care facilities, public libraries, community centers) on nonparticipating property
- Requires wind turbines to be sited at least 1.1 times the total facility height from nonparticipating property boundaries, public road rights-of-way, and railroad rights-of-way
- Defines key terms including "renewable electric power generation facility" to cover battery energy storage systems, solar energy conversion facilities, and wind energy conversion facilities with nameplate capacity greater than 100 kilowatts
- Applies retroactively to wind energy conversion facilities proposed after January 1, 2026
Legislative Description
A bill for an act relating to the siting and operation of renewable electric power generating facilities, and including retroactive applicability provisions.
Last Action
Introduced, referred to Commerce. H.J. 192.
2/3/2026
Committee Referrals
Commerce2/3/2026
Full Bill Text
No bill text available