IA HF2283
Bill
Status
2/5/2026
Primary Sponsor
Charley Thomson
Click for details
AI Summary
-
Public utilities and transmission companies owning or operating electric transmission lines in Iowa must submit feasibility studies to the Iowa Utilities Commission by January 1, 2027, and every three years thereafter
-
Studies must evaluate grid-enhancing technologies (dynamic line rating systems, power flow control systems, topology optimization) and identify transmission lines suitable for reconductoring with advanced conductors
-
Projects must address specific purposes including increasing transmission capacity, reducing congestion, connecting renewable resources, improving reliability, reducing land impacts from new transmission lines, and serving increased customer load
-
Advanced conductors are defined as having at least 10% lower direct current electrical resistance than existing conductors of similar diameter
-
Municipal utilities, cooperative electric associations, and companies owning transmission lines serving single customers or interconnecting single generating facilities are exempt from these requirements
Legislative Description
A bill for an act relating to grid-enhancing technologies and reconductoring, including study and reporting requirements.(See HF 2682.)
Last Action
Committee report approving bill, renumbered as HF 2682.
2/23/2026