Loading chat...

IA SF2447

Bill

Status

Introduced

2/23/2026

Primary Sponsor

Commerce

Click for details

Origin

Senate

91st General Assembly

AI Summary

  • Amends Iowa Code Section 476.53A to establish uniform statewide standards for siting wind energy conversion facilities, solar energy conversion facilities over 100 kilowatts, and battery energy storage systems

  • Sets maximum setback requirements for wind turbines: three times the total turbine height from existing dwellings or community buildings on non-participating property, and 1.1 times the total height from non-participating property lines

  • Defines key terms including "abutting dwelling" (occupied residential building on non-participating property), "community building" (schools, places of worship, day care facilities, public libraries, community centers), and "nonparticipating property" (land owned by someone who has not granted permission for the facility)

  • Applies to all wind energy conversion facilities proposed after January 1, 2025, with local authorities prohibited from imposing setback requirements beyond those specified in the bill

  • Expresses legislative intent to encourage renewable electric power development while promoting uniformity in local approval processes and developing transmission capacity to export excess power generated in Iowa

Legislative Description

A bill for an act relating to the siting and operation of renewable electric power generating facilities.(Formerly SF 376.)

Last Action

Committee report, approving bill. S.J. 362.

2/23/2026

Full Bill Text

No bill text available