Loading chat...

IA SF376

Bill

Status

Introduced

2/19/2025

Primary Sponsor

Mike Klimesh

Click for details

Origin

Senate

91st General Assembly

AI Summary

  • Establishes uniform statewide standards for local authority approval of wind energy conversion facilities, solar energy conversion facilities, and battery energy storage systems proposed after January 1, 2025

  • Sets maximum setback requirements local authorities may impose: three times facility height from dwellings/community buildings, 1.1 times height from nonparticipating property, and specific distances (50-100 feet) for solar and battery storage facilities from property lines and infrastructure

  • Limits additional standards local authorities may require, including shadow flicker (maximum 30 hours/year), sound levels (maximum 47 decibels at dwellings), and drainage repair obligations

  • Requires decommissioning plans with financial assurance for non-utility-owned facilities, with 5% of costs due at commercial operation and 100% by year 15; facilities inactive for 24+ months are presumed abandoned

  • Mandates local authorities approve or deny applications within 120 calendar days, prohibits banning renewable facilities in agricultural/industrial zones, and requires existing non-compliant local standards be amended by December 31, 2025

Legislative Description

A bill for an act relating to the siting and operation of renewable electric power generating facilities.(See SF 2447.)

Last Action

Committee report approving bill, renumbered as SF 2447. S.J. 362.

2/23/2026

Committee Referrals

Commerce2/19/2025

Full Bill Text

No bill text available