Wind turbine owners must submit a cash decommissioning deposit to the state treasurer before construction begins on any wind turbine site in Idaho, covering the reasonably anticipated cost of full site removal and land reclamation.
-
A state-licensed engineer with wind turbine removal experience must inspect each site and prepare a cost report, which the Idaho Department of Lands reviews within 30 days; owners pay for the inspection and any independent assessment if costs are disputed.
-
Decommissioning requires removal of all turbine components, buildings, cabling, electrical equipment, and roads (unless landowner requests otherwise), plus restoration of land to previous grade, quality, and productivity.
-
Owners who fail to submit the required deposit face administrative penalties up to $2,500 per turbine site per day; failure to properly decommission results in deposit forfeiture, with the state authorized to complete decommissioning and recover costs from the owner.
-
Creates a wind energy fund in the state treasury to hold deposits and penalties, with interest going to the state general fund; the law takes effect immediately upon passage as emergency legislation.
Legislative Description
Adds to existing law to provide a decommissioning bond for wind turbines within the State of Idaho.
WINDMILL BONDING
Last Action
Retained on General Orders
4/4/2025