ID H0387

Bill

Status

Introduced

3/7/2025

Primary Sponsor

State Affairs Committee

Click for details

Origin

House of Representatives

2025 Regular Session

AI Summary

  • Wind turbine owners must submit a cash decommissioning deposit to the state treasurer before construction begins on any wind turbine site in Idaho, covering the reasonably anticipated cost of full site removal and land reclamation.

  • A state-licensed engineer with wind turbine removal experience must inspect each site and prepare a cost report, which the Idaho Department of Lands reviews within 30 days; owners pay for the inspection and any independent assessment if costs are disputed.

  • Decommissioning requires removal of all turbine components, buildings, cabling, electrical equipment, and roads (unless landowner requests otherwise), plus restoration of land to previous grade, quality, and productivity.

  • Owners who fail to submit the required deposit face administrative penalties up to $2,500 per turbine site per day; failure to properly decommission results in deposit forfeiture, with the state authorized to complete decommissioning and recover costs from the owner.

  • Creates a wind energy fund in the state treasury to hold deposits and penalties, with interest going to the state general fund; the law takes effect immediately upon passage as emergency legislation.

Legislative Description

Adds to existing law to provide a decommissioning bond for wind turbines within the State of Idaho.

WINDMILL BONDING

Last Action

Retained on General Orders

4/4/2025

Committee Referrals

Environment, Energy and Technology3/10/2025

Full Bill Text

No bill text available