Loading chat...
IL SB2975
Bill
AI Summary
-
Requires the Illinois Pollution Control Board to adopt rules within 180 days mandating groundwater monitoring at all clean construction or demolition debris fill operations and uncontaminated soil fill operations.
-
Groundwater monitoring requirements must be designed to detect and prevent exceedance of the Board's Class I groundwater quality standards and include monitoring frequency, well location methodology, installation timelines, post-closure monitoring for at least 5 years, and financial assurance provisions.
-
Exempts operations where owners or operators completed post-closure maintenance before the bill's effective date and received written notification of permit termination (for debris fill operations) or submitted professional certifications and affidavits demonstrating post-closure maintenance completion (for soil fill operations).
-
Establishes specific monitoring requirements including groundwater well specifications reviewed by the Agency, remedial action procedures for standard exceedances, and requirements for closure and post-closure care with financial assurance.
-
Takes effect immediately upon enactment.
Legislative Description
EPA-GROUNDWATER MONITORING
Last Action
Session Sine Die
1/13/2021