Loading chat...
IL SB0546
Bill
Status
2/23/2021
Primary Sponsor
Don Harmon
Click for details
AI Summary
-
Requires the Pollution Control Board to adopt groundwater monitoring amendments within 180 days for all clean construction or demolition debris fill operations and uncontaminated soil fill operations.
-
Groundwater monitoring requirements must detect and prevent exceedances of Class I groundwater quality standards and include monitoring frequency, well location methodology, installation within one year, post-closure monitoring for at least 5 years, remedial action procedures, and financial assurance.
-
Exempts operations that completed post-closure maintenance before the bill's effective date: clean construction/demolition debris operations with EPA written notification of permit termination, and uncontaminated soil operations with professional certification and affidavit that post-closure maintenance is no longer necessary.
-
Modifies existing provisions in the Environmental Protection Act (415 ILCS 5/22.51 and 22.51a) regarding fill operations in quarries, mines, and other excavations.
-
Takes effect immediately upon becoming law.
Legislative Description
EPA-GROUNDWATER MONITORING
Last Action
Chief Sponsor Changed to Sen. Don Harmon
4/30/2022