Loading chat...

IL SB0546

Bill

Status

Introduced

2/23/2021

Primary Sponsor

Don Harmon

Click for details

Origin

Senate

102nd General Assembly

AI Summary

  • Requires the Pollution Control Board to adopt groundwater monitoring amendments within 180 days for all clean construction or demolition debris fill operations and uncontaminated soil fill operations.

  • Groundwater monitoring requirements must detect and prevent exceedances of Class I groundwater quality standards and include monitoring frequency, well location methodology, installation within one year, post-closure monitoring for at least 5 years, remedial action procedures, and financial assurance.

  • Exempts operations that completed post-closure maintenance before the bill's effective date: clean construction/demolition debris operations with EPA written notification of permit termination, and uncontaminated soil operations with professional certification and affidavit that post-closure maintenance is no longer necessary.

  • Modifies existing provisions in the Environmental Protection Act (415 ILCS 5/22.51 and 22.51a) regarding fill operations in quarries, mines, and other excavations.

  • Takes effect immediately upon becoming law.

Legislative Description

EPA-GROUNDWATER MONITORING

Last Action

Chief Sponsor Changed to Sen. Don Harmon

4/30/2022

Committee Referrals

Assignments4/16/2021
Executive3/3/2021
Assignments2/23/2021

Full Bill Text

No bill text available