Loading chat...

IL SR0985

Resolution

Status

Failed

1/7/2025

Primary Sponsor

Sara Feigenholtz

Click for details

Origin

Senate

103rd General Assembly

AI Summary

  • Urges the Chicago Department of Transportation (CDOT) and Illinois Department of Transportation (IDOT) to transform Du Sable Lake Shore Drive into a true boulevard with a creative, forward-thinking redesign

  • Calls for incorporating safe and efficient multimodal transportation options for pedestrians, cyclists, public transit users, and drivers throughout the corridor

  • Emphasizes green urban mobility and requests changes be part of a comprehensive traffic management plan, including provisions for special events and weather challenges

  • Requests creation of more green space and recreational opportunities for residents and visitors, including repurposing existing infrastructure for recreational use

  • Notes that climate change has caused erosion along Lake Michigan shorelines and deterioration of protective structures along the drive, necessitating the redesign effort

Legislative Description

LAKE SHORE DRIVE REDESIGN

Last Action

Session Sine Die

1/7/2025

Committee Referrals

Assignments5/14/2024

Full Bill Text

No bill text available