Loading chat...

IN SB0097

Bill

Status

Introduced

1/5/2010

Primary Sponsor

Bob Deig

Click for details

Origin

Senate

2010 Regular Session

AI Summary

  • Requires the Indiana Utility Regulatory Commission (IURC) to adopt emergency rules by July 1, 2010 expanding net metering availability to residential, commercial, industrial, agricultural customers, local governments, the state, K-12 schools, and postsecondary institutions

  • Allows generating facilities with nameplate capacity of 2 megawatts or less to interconnect to electric utility distribution systems under net metering

  • Permits net metering customers to interconnect facilities using solar, wind, microhydroelectric, microturbines with renewable fuels, fuel cells with renewable fuels, and biogas including anaerobic digestion and municipal solid waste

  • Voids existing rules at 170 IAC 4-4.2 that do not comply with the new requirements, with the commission required to evaluate compliance by June 1, 2010

  • Requires the IURC to report to the regulatory flexibility committee by November 1, 2010 on progress in finalizing the emergency rules, with the section expiring January 1, 2012

Legislative Description

Net metering.

Last Action

Senator Deig added as coauthor

1/11/2010

Full Bill Text

No bill text available