Loading chat...

MA H3654

Bill

Status

Introduced

2/27/2025

Primary Sponsor

Kip Diggs

Click for details

Origin

House of Representatives

194th General Court

AI Summary

  • MassDOT and MBTA must conduct a feasibility study on establishing year-round, daily rail service between Cape Cod towns (Falmouth, Bourne, Barnstable, Yarmouth, Sandwich) and Boston via the Cape Cod line, Hyannis Branch line, and Woods Hole Branch line

  • Study must evaluate projected capital costs for track, signal, and station upgrades; operating and maintenance plans; high-speed rail potential; environmental justice impacts; and federal/state/local funding availability

  • Study must assess feasibility and costs of assuming ownership of the Cape Cod Canal Railroad Bridge from the U.S. Army Corps of Engineers, including potential replacement with a stationary bridge

  • MassDOT must file the study report within 9 months after the act's effective date with legislative committees on ways and means and transportation

  • MBTA must begin year-round commuter rail service between Buzzards Bay and South Station within 12 months, with minimum 3 AM peak trips and 3 PM peak trips each weekday

Legislative Description

Relative to restoring commuter rail to Cape Cod

Last Action

Reporting date extended to Wednesday, March 18, 2026

12/11/2025

Committee Referrals

Transportation2/27/2025

Full Bill Text

No bill text available