Loading chat...
ME LD29
Bill
Status
6/18/2025
Primary Sponsor
Matthea Larsen Daughtry
Click for details
AI Summary
-
Directs the Maine Department of Transportation to remove inactive railroad track on the Lower Road corridor between Brunswick and Gardiner (connecting to the Kennebec River Rail Trail) plus a portion in Hallowell, replacing it with a paved or stone dust bicycle and pedestrian trail
-
Requires removal of 12.26 miles of inactive railroad track on the Calais Branch from Route 214 in Pembroke to Route 1 in Calais, to be replaced with a multi-use trail
-
Implements recommendations from two advisory councils: the Lower Road Rail Use Advisory Council (11 of 14 members voted in favor after 9 months of meetings) and the Calais Branch Rail Use Advisory Council (10 of 11 members voted in favor after 8 months)
-
All trail conversions are designated as interim in nature, preserving the corridors for potential future rail use under the State Railroad Preservation and Assistance Act
-
Projects are contingent on available funding, permitting, and municipal agreements
Legislative Description
Resolve, to Require the Department of Transportation to Implement the Recommendations of the Lower Road Rail Use Advisory Council and the Calais Branch Rail Use Advisory Council
Railroads
Last Action
Subsequently, FINALLY PASSED in concurrence.
6/18/2025