HB 4881 Summary
-
Extends the net metering program design period from 10 years to 20 years.
-
Removes the requirement that customer generation capacity be limited to meeting only the customer's electric needs, allowing customers to generate excess capacity.
-
Eliminates the 1% statewide net metering cap on utility peak load and associated capacity allocation limits by customer system size (previously 0.5% for systems ≤20 kW, 0.25% for systems >20 kW but ≤150 kW, and 0.25% for systems >150 kW).
-
Changes customer selection criteria from first-come, first-served basis to selection solely based on meeting interconnection and equipment requirements; requires utilities to demonstrate to the commission that any restrictions are necessary for public health, safety, or system integrity.
-
Removes provisions distinguishing "true net metering" for systems ≤20 kW and "modified net metering" for larger systems.
Legislative Description
Energy; electricity; net metering; authorize increased customer generating capacity. Amends sec. 173 of 2008 PA 295 (MCL 460.1173).
Energy: alternative sources
Last Action
Printed Bill Filed 09/18/2015