Loading chat...
MI HB5864
Bill
Status
4/24/2018
Primary Sponsor
Tom Barrett
Click for details
AI Summary
House Bill 5864 Summary
-
Establishes a distributed generation program by July 19, 2017 that allows electric customers to interconnect eligible generators and operate them in parallel with the distribution system.
-
Extends program duration from 10 years to 20 years and permits customers to generate up to 100% of their previous 12 months' electricity consumption.
-
Removes the 1% cap on distributed generation as a percentage of average in-state peak load, eliminating the previous allocation limits for different generator sizes.
-
Changes customer selection from first-come, first-served basis to selection based solely on meeting interconnection and equipment requirements, with restrictions on participant limits requiring commission approval.
-
Removes provisions requiring customers with systems over 20 kilowatts to use modified net metering, consolidating metering requirements under the distributed generation program.
Legislative Description
Energy; electricity; net metering; authorize increased customer generating capacity. Amends sec. 173 of 2008 PA 295 (MCL 460.1173).
Energy: alternative sources
Last Action
Bill Electronically Reproduced 04/24/2018
4/25/2018