MI HB5864

Bill

Status

Introduced

4/24/2018

Primary Sponsor

Tom Barrett

Click for details

Origin

House of Representatives

99th Legislature

AI Summary

House Bill 5864 Summary

  • Establishes a distributed generation program by July 19, 2017 that allows electric customers to interconnect eligible generators and operate them in parallel with the distribution system.

  • Extends program duration from 10 years to 20 years and permits customers to generate up to 100% of their previous 12 months' electricity consumption.

  • Removes the 1% cap on distributed generation as a percentage of average in-state peak load, eliminating the previous allocation limits for different generator sizes.

  • Changes customer selection from first-come, first-served basis to selection based solely on meeting interconnection and equipment requirements, with restrictions on participant limits requiring commission approval.

  • Removes provisions requiring customers with systems over 20 kilowatts to use modified net metering, consolidating metering requirements under the distributed generation program.

Legislative Description

Energy; electricity; net metering; authorize increased customer generating capacity. Amends sec. 173 of 2008 PA 295 (MCL 460.1173).

Energy: alternative sources

Last Action

Bill Electronically Reproduced 04/24/2018

4/25/2018

Committee Referrals

Energy Policy4/24/2018

Full Bill Text

No bill text available