Loading chat...
MI SB0714
Bill
AI Summary
SB 714 Summary
-
Allows temporary erosion control structures to be installed on shoreland without a permit if water levels of specified Great Lakes are at or above designated elevations (Lake Superior 603.1 feet, Lake Michigan/Huron 581.5 feet, Lake St. Clair 576.7 feet, Lake Erie 573.8 feet).
-
Requires property owners to notify the department in writing before installation, providing owner contact information, structure location, and material specifications; structure must be constructed by licensed contractor using department-approved materials.
-
Mandates property owners file a permanent erosion control permit application or remove temporary structure within 78 weeks of installation; if permit denied, structure must be removed within 90 days.
-
Establishes new section 32312c authorizing above-grade walls constructed with movable brick notwithstanding other provisions of the natural resources act.
-
Adds section 32517 detailing temporary erosion control structure requirements and incorporates violation of that section as a criminal offense and potential minor violation under the act.
Legislative Description
Natural resources: shorelands; temporary erosion control structures; authorize without permit during high water levels. Amends secs. 32312, 32312a & 32510 of 1994 PA 451 (MCL 324.32312 et seq.) & adds secs. 32312c & 32517.
Natural resources: Great Lakes
Last Action
Referred To Committee On Ways And Means, With Substitute (h-3)
12/3/2020