HB 4236 Summary

  • Establishes a distributed generation program deadline of July 19, 2017 (replacing the original 90-day requirement from the 2016 amendment).

  • Eliminates the 1% capacity cap on distributed generation programs and removes restrictions limiting participation by system size, allowing unlimited customers to participate based solely on meeting interconnection requirements.

  • Removes selection based on application receipt order and instead requires selection based solely on meeting interconnection requirements for participation.

  • Requires distributed generation equipment to meet IEEE 1547.1 testing standards and UL 1741 scope 1.1A with approval of commission-authorized updates.

  • Maintains net metering distinctions: systems generating 20 kilowatts or less qualify for true net metering, while systems over 20 kilowatts qualify for modified net metering.

Legislative Description

Energy: alternative sources; distributed generation; eliminate caps and references to tariff. Amends sec. 173 of 2008 PA 295 (MCL 460.1173).

Energy: alternative sources

Last Action

Bill Electronically Reproduced 02/11/2021

2/16/2021

Committee Referrals

Energy2/11/2021

Full Bill Text

No bill text available