Loading chat...

MI HB6180

Bill

Status

Introduced

11/26/2024

Primary Sponsor

Phil Skaggs

Click for details

Origin

House of Representatives

102nd Legislature

AI Summary

  • Amends the Stille-DeRossett-Hale single state construction code act to add electric vehicle charging requirements for new residential dwellings built on or after January 1, 2025
  • Requires new single-family dwellings with dedicated parking spaces to have a minimum of 6 kilowatts of power capacity available for electric vehicle charging
  • Requires new multifamily dwellings to have a minimum of 19 kilowatts of power capacity available for every 5 parking spaces for electric vehicle charging
  • Authorizes the bureau of construction codes to establish requirements beyond these minimum standards

Legislative Description

Construction: housing; installation of certain plugs for electric vehicle charging stations; require in the construction of new residential homes. Amends 1972 PA 230 (MCL 125.1501 - 125.1531) by adding sec. 13h.

Construction: housing

Last Action

Bill Electronically Reproduced 12/03/2024

12/3/2024

Committee Referrals

Energy, Communications, And Technology11/26/2024

Full Bill Text

No bill text available