Loading chat...

MI SB0579

Bill

Status

Passed

10/8/2025

Primary Sponsor

Samir Singh

Click for details

Origin

Senate

103rd Legislature

AI Summary

  • Extends the expiration date for various environmental permit fees from October 1, 2025 to October 1, 2029, covering floodplain permits, stormwater discharge permits, surface water discharge permits, and land/water management permits

  • Maintains existing fee structures for floodplain permits ($500 standard, $100 for minor projects, $50 for general permits) with an additional $1,500 assessment when engineering computations are required

  • Continues stormwater discharge fees ranging from $50 for general permit categories to $7,000 for municipal separate storm sewer systems serving populations over 100,000, plus $400 one-time fees for construction site permits

  • Preserves hazardous waste management program fees including $50 site identification number fees and annual handler user charges ranging from $100 to $2,000 depending on generator category and waste volume

  • Maintains operator training and certification examination fees for industrial wastewater, municipal wastewater, and drinking water system operators, ranging from $30 to $70 for examinations and $95 for certification renewals

Legislative Description

Natural resources: other; certain fees in the natural resources and environmental protection act; modify. Amends secs. 3104, 3110, 3118, 3120, 4104, 11153, 30104, 30109, 32312 & 32513 of 1994 PA 451 (MCL 324.3104 et seq.).

Environmental protection: other

Last Action

Assigned Pa 0030'25 With Immediate Effect

10/8/2025

Committee Referrals

Appropriations9/26/2025
Regulatory Affairs9/18/2025

Full Bill Text

No bill text available