Loading chat...
MI SB0579
Bill
AI Summary
-
Extends the expiration date for various environmental permit fees from October 1, 2025 to October 1, 2029, covering floodplain permits, stormwater discharge permits, surface water discharge permits, and land/water management permits
-
Maintains existing fee structures for floodplain permits ($500 standard, $100 for minor projects, $50 for general permits) with an additional $1,500 assessment when engineering computations are required
-
Continues stormwater discharge fees ranging from $50 for general permit categories to $7,000 for municipal separate storm sewer systems serving populations over 100,000, plus $400 one-time fees for construction site permits
-
Preserves hazardous waste management program fees including $50 site identification number fees and annual handler user charges ranging from $100 to $2,000 depending on generator category and waste volume
-
Maintains operator training and certification examination fees for industrial wastewater, municipal wastewater, and drinking water system operators, ranging from $30 to $70 for examinations and $95 for certification renewals
Legislative Description
Natural resources: other; certain fees in the natural resources and environmental protection act; modify. Amends secs. 3104, 3110, 3118, 3120, 4104, 11153, 30104, 30109, 32312 & 32513 of 1994 PA 451 (MCL 324.3104 et seq.).
Environmental protection: other
Last Action
Assigned Pa 0030'25 With Immediate Effect
10/8/2025