Loading chat...
MN HF2915
Bill
Status
4/6/2010
Primary Sponsor
Bernie Lieder
Click for details
AI Summary
-
The commissioner shall classify all bridges into tier 1, 2, or 3 based on traffic volume, sufficiency rating, fracture-critical status, and priority designation, with tier 1 being the highest priority.
-
Tier 1 bridges have average daily traffic above 1,000 and sufficiency rating at or below 50, or are identified as priority projects; tier 2 bridges are fracture-critical or have sufficiency ratings at or below 80; tier 3 includes all other bridges.
-
By June 30, 2018, all tier 1 and tier 2 bridges must be under contract for repair or replacement with load-path-redundant design, except bridges with documented reasons to remain in service.
-
The commissioner must establish a risk-based prioritization system by February 1, 2011 for bridges identified after the program concludes, considering bridge condition, age, load capacity, flood susceptibility, traffic volume, detour length, and functional classification.
-
The commissioner shall establish criteria for determining priority within each tier with safety considerations as a mandatory criterion.
Legislative Description
Bridge project ongoing prioritization provided.
Last Action
Secretary of State, Filed April 1, 2010
4/6/2010