Loading chat...

MN HF2915

Bill

Status

Passed

4/6/2010

Primary Sponsor

Bernie Lieder

Click for details

Origin

House of Representatives

86th Legislature 2009-2010

AI Summary

  • The commissioner shall classify all bridges into tier 1, 2, or 3 based on traffic volume, sufficiency rating, fracture-critical status, and priority designation, with tier 1 being the highest priority.

  • Tier 1 bridges have average daily traffic above 1,000 and sufficiency rating at or below 50, or are identified as priority projects; tier 2 bridges are fracture-critical or have sufficiency ratings at or below 80; tier 3 includes all other bridges.

  • By June 30, 2018, all tier 1 and tier 2 bridges must be under contract for repair or replacement with load-path-redundant design, except bridges with documented reasons to remain in service.

  • The commissioner must establish a risk-based prioritization system by February 1, 2011 for bridges identified after the program concludes, considering bridge condition, age, load capacity, flood susceptibility, traffic volume, detour length, and functional classification.

  • The commissioner shall establish criteria for determining priority within each tier with safety considerations as a mandatory criterion.

Legislative Description

Bridge project ongoing prioritization provided.

Last Action

Secretary of State, Filed April 1, 2010

4/6/2010

Committee Referrals

Rules and Legislative Administration3/24/2010

Full Bill Text

No bill text available