Loading chat...

MN SF2847

Bill

Status

Introduced

2/25/2010

Primary Sponsor

Michael Jungbauer

Click for details

Origin

Senate

86th Legislature 2009-2010

AI Summary

  • Requires the transportation commissioner to classify all bridges into three tiers based on traffic volume, sufficiency rating, and structural characteristics, with tier 1 being the highest priority.

  • Tier 1 includes bridges with average daily traffic above 1,000 and sufficiency rating at or below 50, or bridges designated as priority projects by the commissioner.

  • Tier 2 includes fracture-critical bridges or those with sufficiency ratings at or below 80 that are not tier 1 bridges.

  • Mandates that all tier 1 and tier 2 bridges originally in the program must be under contract for repair or replacement with load-path-redundant design bridges by June 30, 2018, except where reasons for delay are documented.

  • Establishes that after June 30, 2018, subsequent bridge projects must be prioritized using a risk-based system considering factors including bridge condition, age, load capacity, flood susceptibility, traffic volume, and detour length, with system implementation required by February 1, 2011.

Legislative Description

Bridge projects ongoing prioritization authorization

Last Action

Senate: HF substituted on Calendar HF2915

3/25/2010

Committee Referrals

Transportation2/25/2010

Full Bill Text

No bill text available