MN SF2847
Bill
Status
2/25/2010
Primary Sponsor
Michael Jungbauer
Click for details
AI Summary
-
Requires the transportation commissioner to classify all bridges into three tiers based on traffic volume, sufficiency rating, and structural characteristics, with tier 1 being the highest priority.
-
Tier 1 includes bridges with average daily traffic above 1,000 and sufficiency rating at or below 50, or bridges designated as priority projects by the commissioner.
-
Tier 2 includes fracture-critical bridges or those with sufficiency ratings at or below 80 that are not tier 1 bridges.
-
Mandates that all tier 1 and tier 2 bridges originally in the program must be under contract for repair or replacement with load-path-redundant design bridges by June 30, 2018, except where reasons for delay are documented.
-
Establishes that after June 30, 2018, subsequent bridge projects must be prioritized using a risk-based system considering factors including bridge condition, age, load capacity, flood susceptibility, traffic volume, and detour length, with system implementation required by February 1, 2011.
Legislative Description
Bridge projects ongoing prioritization authorization
Last Action
Senate: HF substituted on Calendar HF2915
3/25/2010