Beginning July 1, 2014, electric utilities must request applicants for distributed renewable energy generation interconnection to provide nameplate capacity, total pre-incentive installed cost, energy source, and facility zip code in a commissioner-prescribed format
-
Commissioner of Energy must develop or identify a system to collect and process interconnection information from each utility and make non-project-specific data publicly available on a periodic basis in a format determined by the commissioner
-
Commissioner may solicit proposals from outside parties to develop the data collection system
-
Electric utilities are not responsible for accuracy, completeness, or quality of information collected and transferred under this requirement
-
Information remains nonpublic until the commissioner releases it to the public as provided in the bill; effective the day following final enactment
Legislative Description
Interconnection of distributed renewable electric generation information collection required.
Last Action
Committee report, to adopt as amended and re-refer to Commerce and Consumer Protection Finance and Policy