MN SF2483
Bill
Status
3/10/2014
Primary Sponsor
Foung Hawj
Click for details
AI Summary
-
Defines "solar energy generating system" as devices designed to produce electricity by collecting, transferring, or converting solar-generated energy.
-
Establishes a method to determine whether multiple solar energy systems constructed within a 12-month period and sharing characteristics of a single development (ownership, interconnection, financing) must be combined for sizing purposes under power plant regulations.
-
Requires the Commissioner of Commerce to provide a written size determination within 30 days of request, with the Public Utilities Commission chair making final determinations in disputes.
-
Makes large electric power generating plants powered by solar eligible for alternative review procedures under Chapter 216E, the same streamlined process available for plants under 80 megawatts and natural gas-fueled plants.
-
Effective the day following final enactment.
Legislative Description
Large electric power generating plants regulation and solar generation facilities alternative review authorization
Last Action
Second reading
4/2/2014