MN HF2823
Bill
Status
3/10/2016
Primary Sponsor
Jim Newberger
Click for details
AI Summary
-
Expands qualifying projects for emissions-reduction rate riders to include utility cessation of coal-fired units greater than 500 megawatts with replacement by natural gas-fired units or repowering to natural gas at the same plant.
-
Allows emissions-reduction riders for utility cessation of coal-fired units of 500 megawatts or less with replacement by renewable energy facilities or repowering to renewable energy at the same plant, with a capacity increase limit of 200 megawatts.
-
Permits utilities to add natural gas-fired units or renewable resources in any location as part of coal phase-out projects, provided total accredited capacity does not exceed established limits.
-
Requires utilities proposing generation resources in coal phase-out projects to use a competitive process for acquiring utility-owned generation units.
-
Extends the sunset date for the emissions-reduction rider program from December 31, 2020 to December 31, 2030.
Legislative Description
Emissions-reduction rider qualifying projects that may be approved modified.
Last Action
Author added Metsa.
3/29/2016