Loading chat...

MN HF4066

Bill

Status

Introduced

3/7/2022

Primary Sponsor

Jamie Long

Click for details

Origin

House of Representatives

92nd Legislature 2021-2022

AI Summary

HF4066 Summary

  • Defines three categories of electric vehicle parking infrastructure: "electric vehicle capable space" (parking with electrical infrastructure for future charging station installation), "electric vehicle charging station" (parking with dedicated charging connection), and "electric vehicle ready space" (parking with branch circuit capable of supporting charging station installation)

  • Defines "parking facilities" to include parking lots, garages, ramps, and decks

  • Requires Minnesota State Building Code to mandate a minimum number of electric vehicle ready spaces, capable spaces, and charging stations within or adjacent to new commercial and multifamily structures with on-site parking

  • Exempts residential structures with fewer than four dwelling units from the electric vehicle charging requirements

Legislative Description

Infrastructure required to support the charging of electric vehicles.

Last Action

Committee report, to adopt as amended and re-refer to Climate and Energy Finance and Policy

3/21/2022

Committee Referrals

Climate and Energy Finance & Policy3/21/2022
Labor, Industry, Veterans and Military Affairs Finance & Policy3/7/2022

Full Bill Text

No bill text available