MN SF2723
Bill
Status
3/8/2023
Primary Sponsor
John Hoffman
Click for details
AI Summary
S.F. No. 2723 Summary
-
Adds definition of "locate" as marking the approximate horizontal location of underground facilities within a plus or minus two-foot tolerance, including marking bends, structures, and extensions.
-
Updates utility quality level standards to reference CI/ASCE 38-22 instead of 38-02 guidelines for subsurface utility data collection and depiction.
-
Requires notification center to establish electronic system for stakeholders to report complaints, damages, and delays, with quarterly reports to commissioner and utility operators plus annual summary reports.
-
Extends notice validity period from 14 to 21 calendar days for excavation activities, or six months if excavator arranges periodic mark verification with operators.
-
Mandates operators use global positioning system or equivalent technology by January 1, 2025, to develop as-built drawings of newly installed, improved, or repaired facilities.
-
Requires preliminary design and preconstruction meetings between persons soliciting excavation bids and affected facility operators to communicate project scope, timeline, and coordinate utility relocation.
-
Prohibits excavation contracts requiring excavators to bear utility downtime costs when not at fault; utility owners responsible for delays must pay costs up to civil penalty amounts.
Legislative Description
Provisions governing the excavation notice system modification
Last Action
Referred to Transportation
3/8/2023