MN HF3728
Bill
Status
2/25/2026
Primary Sponsor
Erin Koegel
Click for details
AI Summary
-
Prohibits highway capacity expansion projects from being included in state or metropolitan transportation improvement programs if analysis identifies performance gaps in pavement or bridge asset categories; applies to projects entering improvement programs for fiscal year 2031 or later
-
Requires the commissioner to prepare an annual ten-year capital highway investment plan based on expected funding, estimating funding needed for optimal life cycle investments over at least 60 years, and identifying trunk highway segments that may need removal from the system
-
Mandates a risk-based transportation asset management plan covering pavements, bridges, culverts, buildings, intelligent transportation systems, traffic signals, pedestrian infrastructure, and transit infrastructure, with 10-year performance gap projections
-
Requires maintenance plans for major highway projects covering at least 60 years or the full service life, analyzing fiscal impacts including preventive maintenance, preservation, rehabilitation, operational costs, and indirect costs
-
Creates a fiscal transparency dashboard requirement by January 1, 2027, summarizing expenditures by funding source, statewide multimodal transportation plan objectives, and investment priority areas, with identification of performance gaps
Legislative Description
Requirements on trunk highway system maintenance and expansion established, including to limit trunk highway capacity expansion projects in certain circumstances and to require transportation asset management plans; and technical changes made.
Last Action
Introduction and first reading, referred to Transportation Finance and Policy
2/25/2026