Loading chat...

MO HCR82

Concurrent Resolution

Status

Introduced

5/5/2010

Primary Sponsor

Brian Munzlinger

Click for details

Origin

House of Representatives

2010 Regular Session

AI Summary

  • Urges the United States Congress to authorize and fund the United States Army Corps of Engineers' Comprehensive Plan for Flood Control in the Upper Mississippi River Valley

  • Highlights that the Upper Mississippi River Valley has experienced billions of dollars in flood damage over the past two decades, including the Great Flood of 1993

  • Notes that flood control protects urban and rural areas, highways, railroads, infrastructure, homes, businesses, and wildlife areas throughout the region

  • References a Tennessee Valley Authority study showing that every dollar spent on flood control in the 500-year floodplain generates a nearly five-fold economic return through avoided costs and increased income

  • Directs the Missouri House Chief Clerk to prepare and distribute inscribed copies of the resolution to each member of the Missouri Congressional Delegation

Legislative Description

Urges Congress to authorize and fund the United States Army Corps of Engineers' Comprehensive Plan for Flood Control in the Upper Mississippi River Valley

Last Action

Referred: Conservation and Natural Resources (H)

5/14/2010

Committee Referrals

Conservation and Natural Resources5/14/2010

Full Bill Text

No bill text available