Loading chat...

MO HB1241

Bill

Status

Introduced

3/11/2015

Primary Sponsor

Caleb Jones

Click for details

Origin

House of Representatives

2015 Regular Session

AI Summary

  • Amends section 227.107 RSMo to cap individual highway design-build project contracts at less than $50 million per project
  • Limits the total number of design-build contracts awarded per fiscal year to no more than 2% of all state highway system projects awarded for construction
  • Design-build authority expires July 1, 2018, unless extended by statute
  • Exempts specific projects from the cap and time limitation, including Missouri Route 364, State Highway 169/96th Street intersection, State Highway 92, and the US 40/61 I-64 Missouri River Bridge
  • Requires performance bonds equal to the estimated total construction cost, or at least $250 million with additional security if the project exceeds that threshold

Legislative Description

Specifies that there must be a $50 million cap on individual design build contracts

Last Action

Withdrawn (H)

3/12/2015

Full Bill Text

No bill text available